Scope: Emergency flood mitigation from a broken pipe due to cold temperatures. Areas affected were the 3rd-floor lobby, elevator lobby, hallway, labs B and C, the 2nd-floor lobby, hallway, labs B and C, level D, the 1st-floor lobby and lab C, the ground-floor loading dock, and basement hallway.